Factors affecting e-procurement in tea processing factories - procurement research project
| Institution | Kisii National Polytechnic |
| Course | Supply chain managem... |
| Year | 3rd Year |
| Semester | Unknown |
| Posted By | MAKORI KERECHA |
| File Type | doc |
| Pages | |
| File Size | 436.5 KB |
| Views | 996 |
| Downloads | 0 |
| Price: |
Buy Now
|
Description
general objective of the study was to establish the factors affecting e-procurement in tea processing factories and it was guided by the following objectives; to establish the extent to which system security affects e-procurement implementation, to find out the extent to which cost affects e-procurement implementation, to determine the extent to which legal requirements affects e-procurement implementation in Tea Processing Factories In Nyamira County. This study employed a case study research design to assess e-procurement implementation in Tea Processing Factories in Nyamira County. This study targeted 50 individuals from Tea Processing Factories in Nyamira County. The heads of procurement and stores department and employees among other departments which work with procurement function will be targeted. This study adopted a stratified sampling technique whereby the researcher will carry out a simple random selection of five respondents from the procurement departments and 5 from given sections in finance, marketing and production functions giving a sample size of 40. From the findings it was revealed that; Legal protection of confidential information and the ability to authenticate and enforce electronic contracts were clearly the most cited challenges. Lack of support from the existing legal infrastructure and means for protecting and safeguarding business interest legally while using electronic platform was also seen to be a key challenge. This is clearly corroborated by the fact that currently the ICT policy in existence has not fully created a supportive legal framework where related issues are addressed. The integration of suppliers into a seamless procurement platform as a key objective of any e-procurement system was also noted. Notably internet connectivity and system integration with those of suppliers were key impediments. Lack of trained personnel and necessary support hardware were still key impediments just as was in the case of cost consideration. I recommend that, Supplier enablement to be considered since it might be a component that requires both the firms and its suppliers to work together and create a system that is efficient and mutually integrated. It is Is recommendation as well that both the company should look at a means of working together as a team and build systems that will allow easier e-procurement functionality. More so each party must solicit the support of the other either by sharing related costs, IT platform and resources. Despite internet connectivity being currently a challenge it may not last due to the advent of the fiber optic cable spreading across the country.
Below is the document preview.
DESIGN OF REINFORCED RETAINING WALL PROJECT REPORT
To achieve the objective of this study as stated earlier, the visit companies and offices in order to get the data which will help me to get better result and produce a good report of my research project. This work will be arranged in this way,
Step1; to deal with descriptive study and documenting which show how kabaya terrain is look like and carrying survey and site investigation.
Step2; to produce descriptive study showing drawing based on data will be obtaining
Step2; to assess cost estimation by using appropriate concept
876 Views
0 Downloads
864.4 KB
STRUCTURAL AND ARCHITECTURAL DESIGN OF FOUR STOREY MULTI-SHOPPING COMMERCIAL BLOCK PROJECT REPORT
This project entitled “Structural design of four-story multi-shopping commercial block in Kisii Town”. The objective the research was to conduct a technical detail and study on the implementation of Structure design of proposed four story commercial building in Kisii Town in order to solve the problems of our country to fit in vision of land use. Therefore, conducting this research project could be a sustainable solution to the above-mentioned problems. During this research, the analysis of structural elements was made by combining manual analysis, ArchiCAD 18 & Atlantis software for providing architectural plans, arcGIS software for creating and using maps, compiling geographic data, analyzing mapped information, dynamic cone penetration test for determining allowable bearing capacity of the soil, PROKON software for analyzing and designing of structures. The architectural drawings, analysis and the design of all elements of structure, cross sections and reinforcements were calculated. The study revealed that building dimensions are (21.30m*25.60m) and the minimum requirements steel bar in slab at the top four steel bars of ten diameters (4Ø10mm/m), bottom three steel bars of eight diameters (3Ø8mm/m). Beam at top four steel bar of twenty five diameters (4Ø25mm), bottom (4Ø20mm). For the column ground floor (8Ø25mm), first floor (8Ø20mm), second floor (8Ø14mm) and last (4Ø12mm), stairs (4 Ø 12), foundation (5Ø16mm)
896 Views
0 Downloads
4.11 MB
STRUCTURAL DESIGN OF MORDERN THREE STOREY HOUSE WITH ROOFTOP TERRACE PROJECT REPORT
This work explores the complexities and challenges of designing a three-storey modern house in Kisii Town, Kisii County. In response to rapid urbanization and the essential role of housing in Kisii County(World Bank, 2018;UN-Habitat 2018), there is an increasing demand for modern, sustainable, and community-oriented residential spaces. This study was conducted to help meet the need for modern housing in Kisii County, as the County faces many challenges in providing adequate and sustainable homes.
The project explains the design and modelling of a G+2, three-storey modern house using Autodesk Robot Structural Analysis Professional 2024(Autodesk 2023), as it provides a clear vision through design, construction, and documentation. With the advancement of technology, the use of software to solve numerous problems in every technical discipline problems that formerly took a long time has become quite common. As a result, the use of software technology in civil engineering to analyze, design, and predict the behavior of structures before their lifespan has increased dramatically over the last decade(Kasthurirangan, 2021).
The research focused on designing a modern house with a rooftop terrace, taking into account practical use, visual appeal, safety, and economic viability. Archi CAD 28(Graphisoft, 2023) and Lumion 10(Act-3D, 2020) software were used for producing the architectural design, while Robot Structural Professional was employed for structural design and analysis, following the British Code as the design standar
838 Views
0 Downloads
4.84 MB
STRUCTURAL AND ARCHITECTURAL DESIGN OF TWO COMMERCIAL BUILDING BLOCK PROJECT REPORT
This is a project for construction of two storey commercial building block. This project work “structural design of G+2 commercial building at Nyamache Sub County_ Kisii County sector is a part of fulfillment of advanced diploma as awarded of Kisii National polytechnic (KNP). It contains with conception, structural design which provides proper communication to all of users, this project gives more information about the design and analysis of commercial building. The final project report contains five chapters that are: General Introduction, Literature review, research methodology, system design, analysis and implementation and then Conclusion and Recommendation.
This project report also has been compiled referred to books of different authors and by using equation provided in codes of practice like; British standard used in design of the commercial building. The analysis of each structure members starts with evaluation of all loads that are expected to be carried by structure including self-weight. The structure design of this project detail, beam, slab, stair, column, and foundation by BS8110.
Based on result, the detailed plans of this.
865 Views
0 Downloads
2.37 MB